Project Highlight – Regional Medical Center
The Challenge: a boiler room designed to contain three 125HP boilers and a simple feed tank needed to be brought up to current standards. The hospital’s ownership evaluated the state of the facilities steam generating equipment and found them to be unsafe, inefficient, out-of-date, and close to the end of their useful lifespan. Beyond being safer…
Customer Success Story – Commercial Bakery
The Challenge: a local commercial bakery’s boiler had seen better days, due to ineffective boiler service. There boiler was less efficient than optimum due to severe water side scaling, which reduces heat transfer into the water (heat instead is wasted out of the stack), and unreliable due to fouling of the burner’s internal. The baker was…